By the Earthstone Materials Team · Published November 8, 2026 · Last updated: November 8, 2026
Measure the length and the width in feet, pick your depth, and divide by 27. That gives cubic yards. Add about 20 percent for base materials that compact, and round up to the nearest half yard. The whole job takes a tape measure, a few minutes, and the formula in this guide.
The divide-by-27 formula
Cubic yards equal length times width times depth, with all three in feet, divided by 27.
Start with length and width in feet. Measure the longest run and the widest run, in feet, with a tape measure. Then convert depth from inches to feet by dividing by 12. Three inches is 0.25 feet. Four inches is one third of a foot. Six inches is 0.5 feet. Multiply the three numbers together and divide by 27, and you have cubic yards.
Round up to the nearest half yard. A result of 5.6 cubic yards becomes 6 cubic yards, not 5.5. Check your result with our material calculator, which runs the same formula.
Measuring irregular shapes
Most driveways are not perfect rectangles. Break an irregular driveway into rectangles, measure each one, and add the results together. An L-shaped driveway is two rectangles. A driveway with a parking pad beside it is the main rectangle plus the pad rectangle.
For a curved edge, measure to the widest point of the curve and treat it as a rectangle. That slightly overestimates the area, which is the safe direction: a little extra stone is useful, while a shortfall stops the job.
Write each rectangle down as you go: length, width, depth, and the cubic yards for that piece. Our how much gravel for a driveway guide walks through the same method for a standard driveway shape.
Crown, depth, and the base underneath
A gravel driveway needs a crown: the center slightly higher than the edges, so water sheets off instead of pooling in the middle. The depth you order is the depth of the finished layer, measured from the compacted base to the finished surface, not from the raw ground.
The finished gravel layer is usually 3 to 4 inches over a compacted base. The base itself is usually 4 to 6 inches of crusher run or limerock base, compacted in lifts. Soft or low ground usually needs a thicker base underneath, not just more top stone, because the base is what carries the weight of vehicles.
Measure the top layer and the base layer separately, because they are different materials with different depths. A driveway that needs 6 cubic yards of surface stone may need 9 or more cubic yards of base, before the compaction allowance.
Compaction allowance: about 20 percent for base
Base materials lose volume when compacted. Crusher run, limerock base, and recycled concrete base rock lose 10 to 20 percent of their volume when compacted, so order about 20 percent extra loose material to reach the compacted depth you planned. A base that measures 9 cubic yards compacted needs about 11 cubic yards loose.
Stone that stays loose does not compact the same way. #57 stone is meant to stay loose so water passes through it, so it does not lose volume to compaction. Uneven ground still eats some yardage, so round up and add a little extra for low spots even on a loose stone layer.
When in doubt, order the extra half yard. A second delivery costs more than a slightly generous first order. If you are unsure which material your driveway needs, the material selector narrows it down in a few questions.
Worked examples
Example one: a straight driveway 12 feet wide and 40 feet long. For a 4 inch top layer, the math is 12 times 40 times one third of a foot, divided by 27, which is about 5.9 cubic yards. Round up to 6 cubic yards. For a 6 inch base under the same driveway, the math is 12 times 40 times 0.5 feet, divided by 27, which is about 8.9 cubic yards compacted. Add about 20 percent for compaction, which brings it to about 10.7 cubic yards loose, so round up to 11 cubic yards of base.
Example two: an L-shaped driveway. The main run is 12 feet by 30 feet, and the parking pad is 10 feet by 10 feet. The main run is 360 square feet and the pad is 100 square feet, for 460 square feet in total. At 4 inches deep, that is 460 times one third of a foot, divided by 27, which is about 5.7 cubic yards. Round up to 6 cubic yards of surface stone, then work the base the same way, with the compaction allowance added.
If your driveway has low spots, add a little extra for them, then check the numbers in our how much material do I need guide and get a fast quote with the measurements in hand.