What Goes Under Pavers?

Under pavers goes 4 to 6 inches of compacted limerock base or crusher run, then 1 inch of bedding sand, then the pavers. Skip or skimp on the base and the pavers settle.

By the Earthstone Materials Team  ·  Last updated: September 27, 2026

The direct answer: under pavers goes 4 to 6 inches of compacted limerock base or crusher run, then 1 inch of bedding sand, then the pavers themselves, locked in with edge restraint. The base carries the load; the sand beds the pavers level; the edging keeps the whole assembly from spreading. Every failed paver job we hear about traces back to one of those three being skipped.

The layer stack, bottom to top

LayerMaterialDepthJob
SubgradeExisting soil, compacted-Foundation; must be firm and graded for drainage
BaseLimerock base or crusher run4 to 6 in. compactedCarries the load; the structural layer
BeddingBedding sand (concrete sand)1 in.Levels the pavers; never more than 1.5 in.
PaversYour chosen paversPer manufacturerThe wearing surface
Edge restraintConcrete, pavers, or plastic edging-Keeps pavers from migrating outward

Why the base matters most in South Florida

Our native soil is sand over a high water table. Without a compacted base, pavers press straight into the subgrade and settle unevenly, especially after the rainy season saturates the ground. Limerock base is the local standard because it compacts into a dense layer that bridges soft spots. Compact it in lifts: two passes at 2 to 3 inches each beats one pass at 6 inches.

The bedding sand rule

One inch of bedding sand, screeded level, no more. Thick sand is the most common DIY mistake: beyond about 1.5 inches the sand layer itself becomes the thing that settles. Do not use stone dust or limerock fines as bedding in wet areas; they hold water against the pavers. And never lay pavers directly on the base rock without bedding; you will never get them level.

Drainage and slope

Grade the whole assembly away from the house at roughly a quarter inch per foot. Water that ponds on pavers finds its way down and undermines the base. Where the patio meets a low spot, a strip drain with #57 stone at the edge carries runoff away. In flood-prone lots, raising the patio on additional compacted fill (Clean Fill Dirt #1 under the base) beats fighting standing water forever.

How much base to order

Figure the patio square footage, multiply by the loose depth (about 5 to 7 inches to net 4 to 6 compacted), and convert to yards. Our material calculator handles it, and request a quote with the dimensions gets you a delivered price. Order the base first; it goes in before anything else arrives.

Frequently asked questions

No. #57 does not compact, so pavers laid over it settle into the voids. Use limerock base or crusher run, compacted in lifts.
Patios: 4 inches compacted is usually enough. Driveways: 6 inches compacted, because vehicles are far heavier than foot traffic.
On mucky or organic South Florida soil, fabric keeps the base from mixing into the subgrade. On clean firm sand it is optional.
Polymeric joint sand, swept into the joints after the pavers are laid and compacted. That is separate from the 1-inch bedding layer underneath.
Sometimes, with a thin bedding layer and attention to drainage and door thresholds. The slab must be sound and the added height must not create trip or drainage problems.