Rip Rap Seawall Guide

A canal bank that sheds stone every storm is a bank that needs armor. Rip rap absorbs the water's energy before it reaches the soil behind it.

By the Earthstone Materials Team  ·  Published November 8, 2026  ·  Last updated: November 8, 2026

Rip rap is large, heavy, angular limestone rock placed along shorelines, canal banks, and slopes. It absorbs wave action and storm runoff so the water spends its energy on stone instead of on soil. A bank protected by rip rap holds its shape through storms that would wash a bare bank away. The work is straightforward, but the sizing and the permitting questions deserve care, and this guide covers both.

How rip rap protects a bank

Water moving against a bare bank pulls soil away grain by grain. Rip rap breaks that process up. Each angular stone locks against its neighbors, and the gaps between stones slow the water down and let it drain through instead of running across the surface. The stone layer spreads the force of waves and runoff across the whole bank instead of letting it concentrate on one soft spot. That is why rip rap shows up on canal banks, shorelines, and slopes where erosion is the problem, and why it is also used at heavy-flow outfalls and swales where smaller stone would wash away.

Sizes: 8 to 12 inch, 12 to 18 inch, and 20 to 30 inch

We stock rip rap in three sizes: 8 to 12 inch, 12 to 18 inch, and 20 to 30 inch. Smaller stone suits calmer water and gentler slopes, while larger stone suits heavier wave action and steeper banks, because heavier stone is harder for moving water to shift. As a starting point, a sheltered canal bank often takes the smaller sizes, and an exposed shoreline often takes the larger ones. Sizing is a judgment call that depends on the water, the slope, and the soil behind the bank, so confirm the size with an engineer before ordering for a seawall or a bank that has already lost soil. Ordering the wrong size means either stone that washes away or stone that costs more than the job needed.

Fabric underneath

Stone alone is not enough. A layer of geotextile fabric goes under the rip rap, between the stone and the soil. The fabric lets water drain through while holding the soil in place, so the soil cannot wash out through the gaps between stones. Without fabric, the soil behind the bank migrates out through the stone over time, the bank settles, and the rip rap sinks into the hole it was meant to protect. Lay the fabric on the shaped bank first, then place the stone over it. South Florida's sandy soil is quick to migrate, which is why the fabric matters as much as the stone. For more on how fabric and stone work together in wet ground, see our drainage rock guide and our guide to the best rock for a French drain in Florida.

Permits and when to call an engineer

Work on a canal bank or a seawall can touch rules that a driveway never meets. Waterways, seawalls, and shoreline work may need approval before work starts, and the rules vary by city and by waterway. Check with the city's building department before ordering stone for a seawall or a canal bank project, and ask what approvals apply to your address. Call an engineer when the bank has already lost soil, when the seawall itself is damaged or leaning, when the slope is steep, or when the project is structural rather than a simple stone refresh. An engineer sizes the stone, designs the bank, and signs off on work that a supplier cannot. If you are unsure whether your project needs either step, ask the building department first and the engineer second.

Ordering and delivery

Minimum delivery is four cubic yards by dump truck. Tell us the size, the quantity, and the drop location, and request a fast quote for rip rap. Rip rap is heavy, so confirm truck access to the drop point when you order. Same-day delivery is available on in-stock materials when you call or text (561) 489-4948 before 4:00 PM Eastern.

Frequently asked questions

We stock 8 to 12 inch, 12 to 18 inch, and 20 to 30 inch rip rap. Calmer water and gentler slopes usually take the smaller sizes, and heavier wave action and steeper banks take the larger sizes. Confirm the size with an engineer before ordering for a seawall or a bank that has already lost soil.
Yes. Lay geotextile fabric on the shaped bank before placing the stone. The fabric lets water drain through while holding the soil in place, so soil cannot wash out through the gaps between stones. Without fabric, the bank settles and the rip rap sinks over time.
Rip rap absorbs wave action and storm runoff so water spends its energy on the stone instead of the soil behind it, which slows erosion on the bank. It works best with fabric underneath and stone sized for the water it faces. A bank that has already lost a lot of soil needs an engineer to look at it first.
Check with the city's building department before starting work on a seawall or canal bank. Rules vary by city and by waterway, and the building department can tell you what approvals apply to your address.
Four cubic yards per delivery, by dump truck. If you call or text (561) 489-4948 before 4:00 PM Eastern and the size you need is in stock, same-day delivery is available.

Ready when you are.

Tell us the material, quantity, and drop location. We'll handle the rest.

Get a fast quoteCall now
Call (561) 489-4948Get a quote