By the Earthstone Materials Team · Published November 8, 2026 · Last updated: November 8, 2026
Raising a yard is a volume problem, and the math is simple. Multiply length by width by depth in feet, divide by 27, and round up to the nearest half yard. A 30 by 40 foot area raised 6 inches takes about 22.5 cubic yards. Fill settles, so allow extra and compact in lifts.
The formula, step by step
Measure the length and width in feet. Measure the raise in inches, then convert it to feet by dividing by 12, so 6 inches is half a foot and 12 inches is a full foot. Multiply length by width by depth in feet, then divide by 27. Round the result up to the nearest half yard, never down, and remember the four cubic yard minimum delivery. For an odd shape, break it into rectangles, figure each one, and add them together. On slopes and low spots, use the average depth rather than the deepest point, or the order will overshoot. Our material calculator, and use our material selector to confirm which fill fits the job.
Worked examples
Example one, a full yard raise: a 30 by 40 foot area raised 6 inches is 600 cubic feet, divided by 27 is about 22.2 cubic yards, so order 22.5. Example two, a low spot: a 10 by 12 foot hollow filled 12 inches deep is 120 cubic feet, about 4.4 cubic yards, so order 4.5, which clears the four cubic yard minimum. Example three, a small lift: a 20 by 20 foot area raised 3 inches takes about 3.7 cubic yards, which rounds up to 4, exactly the minimum. Rounding up is cheap insurance: a second small delivery costs more than a slightly generous first order.
Settlement: fill settles, so allow for it
Fresh fill is loose, and loose fill settles as it is compacted and as rain works through it. Spread the fill and compact it in lifts, in layers a few inches at a time. Allow about 20 percent extra loose material for compaction and settling on top of the formula result, then round up to the nearest half yard again. If the finished grade has to hit an exact height, overfill slightly and let the final lift settle to the mark. For anything structural, like fill under a slab, use screened fill and compact it in lifts; unscreened fill can hold pockets that settle or break down and leave voids under the slab.
Clean Fill Dirt #1 vs Fill Dirt #2
The two fills differ in one thing: screening. Clean Fill Dirt #1 is screened fill dirt, free of roots, trash, and large debris, used to build grade and shape lots before sod or construction. It is the pick under slabs, under sod, and anywhere the finished surface matters, because nothing in it will rot or settle unevenly. Fill Dirt #2 is an economical unscreened fill dirt for raising grade, filling low spots, and rough grading where finish screening is not needed. It is the practical pick for a big rough raise or backfill where a little settling is acceptable. Our Clean Fill Dirt #1 vs Fill Dirt #2 guide compares the two in more depth.
After the grade is set: topsoil, water, and checks
Fill dirt shapes the ground; it does not feed plants. Fill dirt has little organic matter and compacts hard, so turf struggles to root in it. Once the grade is set, cap it with topsoil before sod or seed: 1 to 2 inches over beds is the usual range, as our topsoil vs fill dirt guide explains. Grade the finished surface so water runs away from the house and the driveway, because fill dirt is finer than stone and holds water longer. If the raise changes how water flows onto a neighbor's lot, or the work sits near a structure, confirm with your city building department before the trucks roll. Tell us the material, the measurements, and the drop location in a fast quote and we will confirm the quantity. Same-day delivery is available on in-stock materials when you call or text (561) 489-4948 before 4:00 PM Eastern.