FDOT Limerock Base Guide

FDOT limerock base is Florida's signature graded base rock. When a permit or a set of plans calls for it by name, nothing else on the yard substitutes.

By the Earthstone Materials Team  ·  Published November 8, 2026  ·  Last updated: November 8, 2026

Limerock is the natural base material of South Florida, quarried from Florida limestone. It compacts dense into a hard, stable layer for paver bases, road bases, foundation pads, and heavy-traffic areas. The FDOT name matters because it tells the inspector, the engineer, and the contractor that the material was produced to meet the Florida Department of Transportation's requirements for base material. If your plans call for FDOT limerock base, order FDOT limerock base.

What meeting FDOT specifications means

When a supplier says a base material meets FDOT specifications, it means the material is produced and graded to meet the Florida Department of Transportation's requirements for base material used in road and permitted work. It is not a marketing label. It is the same material category the state uses under its own roads, and it is the material engineers write into plans when they want a proven, inspectable base. This page does not publish spec numbers, gradation percentages, or test standards, because the governing document for your job is the project plans and the current FDOT standard specifications. If you need a specific gradation or a test result for a submittal, ask the engineer of record or the permitting authority which document governs your job, and tell us what they ask for when you order.

Where permitted work requires it

Permitted work usually names its base material in the plans. A driveway permit, a road build, or a commercial pad may call out FDOT limerock base by name, while a private patio may leave the choice open. The plans decide, not the supplier. If your plans name FDOT limerock base, use it. If the plans are silent, ask the engineer of record or the city's building department before substituting another base material. A substitution that looks fine on the ground can fail an inspection if the paperwork names something else.

  • Road bases: the standard use, and the reason the material carries the FDOT name.
  • Paver bases: the compacted layer under driveways, patios, and walkways. See what goes under pavers for the full layer stack.
  • Foundation pads: a dense, level base that stays put under load.
  • Heavy-traffic areas: parking pads and equipment yards where a loose surface would rut.

Unpermitted work has more room to choose. A private driveway or a shed pad with no permit attached can often use crusher run or recycled concrete base rock instead, and our FDOT limerock base page covers the material itself. The question to answer first is always the same: what do the plans say. When in doubt, confirm with the engineer or the city's building department rather than guessing.

Typical depths and compaction

Base layers in South Florida are commonly 4 to 6 inches deep when compacted. Patios often sit on 4 inches of compacted base, while driveways and heavier traffic areas usually take 6 inches. That range is a starting point, not a specification. Permitted work follows the depth shown on the approved plans, so confirm the depth with the engineer of record before you order.

Limerock base is compacted in lifts, which means it is spread and rolled in layers rather than dumped all at once and pressed from the top. Base materials lose 10 to 20 percent of their volume when compacted, so order about 20 percent more loose material than the finished depth calls for. A 12 by 40 foot driveway at 6 inches of compacted base works out to about 9 cubic yards before compaction, so plan on about 11 cubic yards loose. Our material calculator runs the yardage math for any size, and our material selector recommends a material in six questions.

FDOT limerock base vs #57 stone

These two materials do opposite jobs. Limerock base contains fines that lock together under compaction into a hard surface. #57 stone is clean crushed stone with the fines screened out, so it stays loose and moves water. Use limerock base where you need a hard, load-bearing layer, and #57 stone where you need drainage. Never use #57 stone as a base under pavers or concrete, because it never locks together and the surface above it settles. Our comparison, #57 stone vs limerock base, walks through the choice in more detail.

Ordering and delivery

Minimum delivery is four cubic yards by dump truck. Tell us the material, the quantity, and the drop location, and request a fast quote. Same-day delivery is available on in-stock materials when you call or text (561) 489-4948 before 4:00 PM Eastern. If your job is permitted, have the plans handy when you call so we can confirm the material matches what the plans name.

Frequently asked questions

FDOT limerock base is Florida's signature graded base rock, quarried from Florida limestone. It compacts dense into a hard, stable layer for paver bases, road bases, foundation pads, and heavy-traffic areas. It is the base material the Florida Department of Transportation uses under its own roads.
It means the material is produced and graded to meet the Florida Department of Transportation's requirements for base material. If your plans name FDOT limerock base, that is the material to order. For submittals or inspection questions, confirm the governing document with the engineer of record or the permitting authority.
It depends on what your plans call for. Some permits name FDOT limerock base, and some leave the base material open. Check the approved plans, or ask the engineer of record or the city's building department before choosing a different base material.
For most residential bases, plan on 4 to 6 inches of compacted limerock, with patios at the shallow end and driveways at the deeper end. Permitted work follows the depth shown on the approved plans, so confirm it with the engineer of record. Because base material loses 10 to 20 percent of its volume when compacted, order about 20 percent more loose material than the finished depth calls for.
Measure the length and the width in feet and the depth in feet, multiply the three numbers together, and divide by 27 for cubic yards. Then add about 20 percent for compaction. Our material calculator runs the same calculation in one step, and the worked driveway example above shows how the numbers land.

Ready when you are.