Tons vs Cubic Yards

A cubic yard measures volume, a ton measures weight, and the conversion depends on the material. Here is how to translate between them without over-ordering.

By the Earthstone Materials Team  ·  Last updated: September 27, 2026

The direct answer: a cubic yard is a volume (3 feet by 3 feet by 3 feet); a ton is a weight (2,000 pounds). How many tons are in a cubic yard depends entirely on the material: dense crushed stone runs about 1.4 to 1.5 tons per yard, sand is similar, and topsoil is closer to 1 ton per yard. Moisture moves those numbers too; a yard of sand after a rainstorm weighs noticeably more than a dry one.

Why both units exist

Landscapers and homeowners think in cubic yards because projects are measured in volume: how many yards to fill a bed, top a driveway, or level a yard. Quarries and truckers think in tons because trucks are limited by weight, not volume. A dump truck might legally haul 18 tons, which is roughly 12 to 13 yards of stone but 16-plus yards of topsoil. When a supplier quotes per ton and your project is measured in yards, you need the conversion to compare apples to apples.

Rough conversions for common materials

MaterialTons per cubic yard (approx.)Yards per ton (approx.)
Crushed stone (#57, crusher run, drain rock)1.4 to 1.50.67 to 0.71
Limerock base1.4 to 1.60.63 to 0.71
Sand (mason, concrete, fill)1.3 to 1.50.67 to 0.77
Topsoil / soil blends1.0 to 1.20.83 to 1.0
Rip rap1.3 to 1.50.67 to 0.77

These are working approximations, not lab values. Moisture, gradation, and how settled the pile is all shift the real number. For ordering purposes they are close enough; for engineering work, use certified weights.

The conversion math

Tons to yards: divide tons by the tons-per-yard figure. Ten tons of #57 stone at 1.4 tons per yard is about 7.1 yards.
Yards to tons: multiply yards by the tons-per-yard figure. Eight yards of topsoil at 1.1 tons per yard is about 8.8 tons, well within a single truckload.
When in doubt, round the material side up: running short mid-project costs more than the extra half yard.

Why it matters for delivery

Truck capacity is the practical reason this matters. Our trucks are weight-limited, so a "full load" of dense stone is fewer yards than a full load of topsoil. When you request a quote, give us the material and the project dimensions; we will translate that into the right number of loads. Our material calculator estimates yards from length, width, and depth, and shows a rough tonnage alongside.

Frequently asked questions

Compute cubic yards first (length x width x depth in feet, divided by 27), then multiply by about 1.4 for stone. A 7.5-yard driveway needs roughly 10.5 tons of crusher run.
Different materials. Ten tons of topsoil is about 9 yards; ten tons of stone is about 7. Same weight, visibly different volume.
We quote and deliver by the cubic yard, which matches how projects are measured. We handle the weight math on the trucking side.
Yes. Saturated sand or soil can weigh 10 to 20 percent more per yard than dry material. The volume stays the same, so your yard count does not change.
It depends on the truck and the material's weight. Tell us the material and quantity when you order and we will plan the loads; you do not need to solve the trucking math yourself.