#57 Stone Delivery in Key West, FL
Behind an Old Town guesthouse in Key West, a dry well only works if the stone around it stays open to water, and #57 stone is clean crushed limestone graded to 3/4 inch, with the fines screened out so water passes through the open voids. In Key West it is the stone for courtyard drains and dry wells, where coral rock and thin soil leave standing water nowhere to go and every drop has to be staged around narrow lanes.
#57 Stone in Key West: the short answer
Yes, #57 stone is the right call for most Key West drainage jobs, from French drains to dry wells and drain fields. Its open voids move water through ground that barely absorbs any. It will not compact, so do not use it as a driving surface. For a firm surface, order crusher run or FDOT limerock base instead.
Why #57 Stone fits Key West
Dry wells behind island homes
A dry well behind a Key West guesthouse or courtyard home needs stone that takes water in and lets it seep away slowly. #57 stone's clean voids do that job, and the stone can be hand-carried from a staged pile at the curb when no equipment fits.
Courtyard drainage on coral rock
Coral rock and thin soil mean drainage stone is the default fix for standing water in Key West. A French drain filled with #57 stone gives courtyard water a path instead of letting it sit against walls and foundations.
Drainage that fits tight access
Every Key West delivery starts with access, and #57 stone suits that reality. It arrives in staged drops at the nearest reachable point, and crews carry it in by hand to the drain or well it was ordered for.
#57 Stone specifications
| Size | 3/4 inch |
|---|---|
| Best uses | French drains, drain fields, driveway base, concrete aggregate |
| Not ideal for | Projects that need a compacted surface (it will not lock tight without fines) |
| Drains or compacts | Drains: open voids let water pass through |
| Washed / contains fines | Screened clean; no fines |
| Sold by | Cubic yard and ton |

Common Key West projects for #57 Stone
- Dry well behind a guesthouse: Clean stone hand-carried from staged piles at the curb to a new dry well behind an Old Town guesthouse.
- Courtyard French drain: #57 stone in a trench that carries courtyard water away from an island home with no room for equipment.
- Drain field stone: Open-graded stone around drain field pipework where thin soil over coral rock cannot absorb runoff.
- Downspout drainage bed: A stone bed at a downspout outlet that spreads roof water into the ground instead of ponding on the courtyard.
#57 Stone delivery in Key West
- Minimum order is 4 cubic yards, dumped where the truck can safely reach.
- Same-day delivery is available on in-stock materials when you call or text before 4:00 PM Eastern.
- Call or text (561) 489-4948 with the address and the drop spot. Tell us about gates, tight turns, or low wires and we will plan the drop.
- Gated community or HOA? Share the gate procedure and any delivery window when you order so the truck is not turned away at the entrance.
- Streets are tight and parking is scarce, so confirm the delivery timing and the exact staging spot in advance.
- Many properties need material carried in by hand, so we pile it where the crew can reach it.
See all aggregate delivery in Key West or browse #57 Stone delivery across South Florida.
More materials in Key West
Questions about #57 Stone delivery in Key West
Ready when you are.
Call or text (561) 489-4948 for #57 Stone delivered to your Key West site. Same-day delivery is available on in-stock materials when you call or text before 4:00 PM Eastern.